Background & Challenge
Leed had recently acquired two Volvo A30G Articulated Dump Trucks (ADTs) and needed custom 23,000L water cartage solutions to meet the demanding requirements of the Snowy Hydro 2.0 project. They turned to Allquip to bring their vision to life.
They needed more than a standard build. LEED needed a solution that would integrate seamlessly with Volvo ADT chassis, meet strict safety, operator and site requirements, and be backed by full engineering support with exceptional build quality and reliable delivery timelines.
The solution had to be robust, compliant, and built for continuous operation in tough, high-output conditions. So they partnered with Allquip to deliver a fully engineered solution from concept through to commissioning.
The Solution
Allquip delivered two fully customised ADT water trucks, purpose-built for
Snowy Hydro 2.0. Working closely with LEED, we provided
Australian-made Quality
All tanks and modules were manufactured locally, aligning with Leed’s commitment to supporting the Australian industry while ensuring full control over quality and engineering standards.
Built for the Long-Haul
Advanced manufacturing techniques ensure long-term durability and reliability in tough conditions.
Safety-First Design
Allquip integrated multiple safety enhancements, including:
- High-contrast grab rails
- Field maintenance platforms
- Access modifications with static lines for working at heights
- Collapsible handrail systems
- Additional site-specific signage
Seamless Integration
Custom control layouts were fully integrated with the Volvo systems, ensuring smooth performance and intuitive operator use. The design prioritised ergonomics and usability without compromising functionality.
The Allquip Benefit: Collaborative Process
Allquip worked closely with LEED throughout the build, providing:
- Detailed engineered drawings
- 3D rendered visuals prior to fabrication
- Transparent communication and scheduling
- Design review and approval opportunities before production
Client Testimonial
“Allquip’s passion for Australian-made quality and attention to detail was clear from day one. They customised the build to suit our exact operator and safety needs, without ever compromising on quality.
Their team was transparent, responsive, and easy to work with. Allquip assisted with engineering and refining the concept with us through to the delivery of a ready-to-roll product. The integration with our Volvos was flawless, and their professionalism and ‘can-do’ attitude made theprocess seamless.”
— Leed Plant
The Result
Allquip delivered two fully integrated ADT water trucks that met all Snowy Hydro 2.0 requirements and exceeded expectations in build quality, safety integration and operability.
The seamless integration with the Volvo A30Gs and attention to detail throughout the process established a strong, trusted partnership between Allquip and Leed.
For complex civil and mining projects where compliance, durability and integration matter, Allquip delivers engineered solutions that perform.