Purpose-Built ADT Water Trucks for Leed Plant Pty Ltd

Allquip supplied two 23,000L ADT water trucks, concept to commissioning, for Snowy Hydro 2.0, built in Australia and integrated with Volvo A30G chassis to meet strict site requirements.
Client: Leed Plant Pty Ltd
Date: August 5, 2025

Background & Challenge

Leed had recently acquired two Volvo A30G Articulated Dump Trucks (ADTs) and needed custom 23,000L water cartage solutions to meet the demanding requirements of the Snowy Hydro 2.0 project. They turned to Allquip to bring their vision to life.

They needed more than a standard build. LEED needed a solution that would integrate seamlessly with Volvo ADT chassis, meet strict safety, operator and site requirements, and be backed by full engineering support with exceptional build quality and reliable delivery timelines.

The solution had to be robust, compliant, and built for continuous operation in tough, high-output conditions. So they partnered with Allquip to deliver a fully engineered solution from concept through to commissioning.

The Solution

Allquip delivered two fully customised ADT water trucks, purpose-built for

Snowy Hydro 2.0. Working closely with LEED, we provided

Australian-made Quality

All tanks and modules were manufactured locally, aligning with Leed’s commitment to supporting the Australian industry while ensuring full control over quality and engineering standards.

Built for the Long-Haul

Advanced manufacturing techniques ensure long-term durability and reliability in tough conditions.

Safety-First Design

Allquip integrated multiple safety enhancements, including:

  • High-contrast grab rails
  • Field maintenance platforms
  • Access modifications with static lines for working at heights
  • Collapsible handrail systems
  • Additional site-specific signage

Seamless Integration

Custom control layouts were fully integrated with the Volvo systems, ensuring smooth performance and intuitive operator use. The design prioritised ergonomics and usability without compromising functionality.

The Allquip Benefit: Collaborative Process

Allquip worked closely with LEED throughout the build, providing:

  • Detailed engineered drawings
  • 3D rendered visuals prior to fabrication
  • Transparent communication and scheduling
  • Design review and approval opportunities before production

Client Testimonial

“Allquip’s passion for Australian-made quality and attention to detail was clear from day one. They customised the build to suit our exact operator and safety needs, without ever compromising on quality. 

Their team was transparent, responsive, and easy to work with. Allquip assisted with engineering and refining the concept with us through to the delivery of a ready-to-roll product. The integration with our Volvos was flawless, and their professionalism and ‘can-do’ attitude made theprocess seamless.” 

— Leed Plant 

The Result

Allquip delivered two fully integrated ADT water trucks that met all Snowy Hydro 2.0 requirements and exceeded expectations in build quality, safety integration and operability.  

The seamless integration with the Volvo A30Gs and attention to detail throughout the process established a strong, trusted partnership between Allquip and Leed. 

For complex civil and mining projects where compliance, durability and integration matter, Allquip delivers engineered solutions that perform. 

Contact Us

Get in touch and one of our solutions experts will help guide you to find the perfect water cartage solution for your needs.

View Our Latest Case Studies

Find out how Allquip Water Trucks has helped clients across Australia, industries and business sizes to achieve better outcomes for their business.

Subscribe To Our Newsletter